Approach
Your brief is the building.
We arrive with questions, not a style. Before we draw a line, we write down a day in the life of the people who will use the place.
Five questions
Asked at the first meeting, answered in writing.
- i.
Who will use it, hour by hour?
Patients and nurses, a family of five, forty people at their desks. We name them, count them and follow them through their day, because the plan has to work for all of them at once.
- ii.
What must it never fail at?
Every place has one job it cannot get wrong: a clean operating theatre, a kitchen that works at 7 am, a lobby that welcomes. We find it first and protect it in every drawing.
- iii.
What does the site give for free?
Light, air, views, rain and shade cost nothing. Orientation, courtyards and overhangs take them before anything is bought.
- iv.
What will it cost to run, not just to build?
Energy, water, cleaning and staff, counted over twenty years, often decide the plan. A shorter corridor or a shaded window pays for itself many times over.
- v.
What should it feel like to arrive?
The gate, the threshold, the light and the welcome are designed last and judged first. They are where a building tells people it was made for them.
A day in the life
Six moments, one day.
Every brief is written as a day before it becomes a plan. Select a moment on the ring to see what we design for in it.
Arrive
The first ten metres: the drop-off, the threshold, the light at the door and who is there to welcome you.
What that means for you
Four promises.
One point of contact
A principal who knows your brief answers your calls, from the first meeting to handover.
Drawings you can read
Three-dimensional views at every stage, so decisions are made on what you will actually get.
Costs you see early
An item-level bill of quantities at design sign-off, before anything is ordered or built.
No surprises on site
Weekly supervision, written site reports and snag lists you can check for yourself.
Five stages
From first meeting to handover.
At every stage you receive something you can read, price and decide on.
- i.
Brief & feasibility
We visit the site, read the rules that apply to it and test what it can hold.
You receive
- A written day-in-the-life brief
- A site and statutory appraisal
- Massing options
- An outline cost
- ii.
Concept
We turn the brief into plans and three-dimensional views you can walk through.
You receive
- Plans and 3D views
- A materials and daylight strategy
- The structural grid
- A cost plan
- iii.
Approvals & design development
We take the design through the authorities and develop every room in detail.
You receive
- Sanctioned drawings
- Coordinated structure and services
- Room-by-room details
- An item-level bill of quantities
- iv.
Tender & procurement
We put the design out to price on one set of documents, so bids can be compared fairly.
You receive
- Comparable bids
- A recommended contractor and vendors
- A programme
- v.
Construction & handover
We stay on site until the keys are handed over.
You receive
- Weekly site reports and snag lists
- Stage certifications
- As-built drawings and care manuals
- The occupancy certificate
Standards
The rulebook we design to.
Compliance is the floor, not the ceiling. Every project is checked against the edition of each code in force on the day.
- NBC 2016 — Parts 3, 4, 6, 8 and 9: planning, fire and life safety, structure, services and plumbing.
- UDCPR 2020 — FSI, setbacks, height, parking and amenity space in Maharashtra; local DCRs in other states.
- IS 1893 · IS 875 · IS 13920 · IS 456 · IS 800 — Seismic and wind loads, ductile detailing, concrete and steel.
- Maharashtra Fire Act 2006 — Fire NOC; IS 2189 detection and IS 15105 sprinklers.
- Harmonised Guidelines 2021 · RPwD Act 2016 — Universal accessibility in every building we design.
- ECBC 2017 · Eco-Niwas Samhita 2018 — Energy codes for commercial and residential buildings.
- GRIHA · IGBC — Green ratings, including IGBC Green Healthcare and Green Interiors.
- NABH · IPHS 2022 · IS 12433 — Hospital accreditation, public health standards and hospital planning.
- IS 732 · IS 3646 · IS 303 · IS 710 — Electrical wiring, interior lighting and plywood for interiors.
- EIA Notification 2006 · Waste Rules 2016 · AERB — Environmental clearance, waste management and radiation safety.
Design criteria we hold ourselves to
Three checks on every project
Concept
Massing, exits, parking, envelope and services strategy are checked before anything is drawn in detail.
Tender
Every drawing and specification is checked against the code edition in force before it goes out to price.
Handover
Occupancy certificate, fire NOC, commissioning tests and as-built drawings are checked before the keys.
The details are not the details. They make the design.